AGPS proposes to its clients to be in charge of the full maintenance of their port equipments (STS, RTGs, MHCs, RS), in order to increase their operations availability.
We have a team of more than 12 engineers and 50 technicians onsite, with a strong field experience, ready to operate 24/7.
AGPS proposes various types of services:
• Full take over of the maintenance and technical department (Owendo, Kribi)
• Technical Assistance for the Maintenance or Technical department (KCT, DIT Douala)
• Preventive and Curative Maintenance,
• Organisation,
• Training of local team, training of customer teams.
Planning of spare parts required in stock,
Equipment: 2 x STS, 4 RTGs, spreaders
AGPS has been supporting the maintenance of the port equipment since its start in 2017. We have set up and trained a team to perform 24/7 maintenance on their port equipment. The STS and RTGs are second-hand equipment, with limited spare part available. Despite these challenges, our team has been able to achieve a performance above 98% of availability for all these equipment.
Our contract includes a KPI with a minimum of 97% of availability.
Equipment: 2 x STS, 4 RTGs, spreaders
AGPS has been supporting the maintenance of the port equipment since its start in 2017. We have set up and trained a team to perform 24/7 maintenance on their port equipment. The STS and RTGs are second-hand equipment, with limited spare part available. Despite these challenges, our team has been able to achieve a performance above 98% of availability for all these equipment.
Our contract includes a KPI with a minimum of 97% of availability.
Kribi Container Terminal – Bollore/CMA-CGM
Equipment: 2 x STS, 5 RTGs, spreaders
We have assisted the management team and technical in their startup process, day 0 to 12 month. The mission was to recruit, train, organize the technical and maintenance team. We have also assisted their teams during operations, for troubleshooting on the equipment.
This has been done with a team of 3 engineers from AGPS based in Kribi.
Repair after accident on a STS boom in Gabon.
Start date 17/06/2019
End date: 15/07/2019
Copyright © 2021 Africa Global Port Solutions - AGPS - All right reserved.